Tie-in

The lift height and the tie-ins are set before the frames leave the yard.

A scaffold starts with the height and where it ties to the building. Ash records both, plus the surface the frames will stand on, then holds one crew.

Open the mic to talk with Ash.

Daylight photo of scaffold frames tied to a brick wall
Ash, dispatch voice

About our AI

Ash sets the height and the tie-ins before the frames leave the yard.

Ash is the voice on this line. This portrait is not the job photo. Ash does not do the work.

Product film

A scaffolding job, held as one ticket.

The film is the dispatch desk. For scaffolding, watch a call become a ticket with lift height in feet and where the frames tie to the building.

Live voice

What Ash handles

Open the mic to talk with Ash.

  1. Lift height in feet
  2. Where the frames tie to the building
  3. Sidewalk, dirt, or a roof to stand on
  4. How long the scaffold stays up
  5. One local crew for the callback, address after they claim it

Scaffold hours

Hours are the unit count times the hours per unit once on site. Engineering for a special tie sits outside that figure.

Planning estimate: 4.5 hours. Hours are the unit count times the hours per unit once on site. Engineering for a special tie sits outside that figure.

From the first fact to a callback.

  1. 01

    Ash takes the height

    The yard loads frames for a height, not for a vague elevation.

  2. 02

    Tie-ins

    A free-standing tower and a tied wall scaffold are different builds.

  3. 03

    One crew

    The window is offered to the nearest paid scaffold company in range.

  4. 04

    They call back

    The caller hears that company will call back. The street address shows after the claim.

Field notes

All articles

Have the height and the tie-in points. Ash can hold the rest.

Book a demo, or open the microphone and talk to Ash.

Open the mic to talk with Ash.

Partners

Take the requests this line already answers.

Lite is $99 per month, 1 seat, and it includes your own phones. You can pass any request. The street address shows after you claim it.

Questions

What should be ready?
The height, the tie-in, and the ground it stands on.
Does Ash build the scaffold?
No. Ash is the dispatch voice. A local crew erects it.
How are hours estimated?
Units times hours per unit once on site.
Why tie-ins before the truck?
Frames without a tie plan get sent back.
When does the street address appear?
After the company claims the request.
What does Lite include?
$99 per month, 1 seat, your own phones. You can pass any request.